Powering your world, safely and efficiently.Request a QuoteSolar and backup planning
Solar Estimator
Use your monthly electricity bill to get a rough starting point for system size and budget. Final sizing and pricing depends on roof space, DB condition, cable routes and load assessment.
01
Your starting point
Tell us how the property uses power.
Estimated from your monthly electricity bill using a planning blended tariff of R3.80 per kWh.
Refine the estimateSupply, daytime use, roof and larger loads
Planning estimate only
Recommended starting point
Backup and solar starting point
GJS must confirm the supply type at the DB or meter.
Roof type is assumed as tile for this estimate.
- Estimated monthly use
- 474 kWh
- Estimated daily use
- 15.8 kWh
- Suggested inverter
- 5 kW single phase
- Suggested battery
- 10.24 kWh
- Suggested panels
- 6 × 620 W
- Estimated solar size
- 3.72 kWp
- Estimated daily solar
- 16.4 kWh
Budget guide ex VAT
R 70 000 to R 90 000Budget guide incl VAT: R 80 000 to R 105 000Estimated monthly bill offsetR 945 to R 1 278
Estimated annual savingR 11 339 to R 15 341
Typical Loads Covered
- Lights
- Wi-Fi
- Security systems
- TVs
- Computers
- Fridges and freezers
- Selected plug circuits
Additional Assessment Required
- Electric ovens
- Electric stoves
- EV charging
- Multiple air conditioners
- Underfloor heating
Why This System Was Suggested
Your R 1 800 monthly bill suggests a small system that balances backup power with daytime solar savings. GJS still needs to confirm the supply type at the DB.
What GJS Still Needs To Verify
- Supply type
- DB condition
- Essential load split
- Cable routes
- Roof space
- Shading
- Municipal requirements
- Battery location
- Planning estimate only. The result is a starting point, not a quote.
- GJS confirms final sizing and pricing after a site inspection and load assessment.
- The estimate uses typical Cape Town solar conditions and a planning blended tariff. Actual usage, generation and savings vary.
- Roof space, orientation, shading, DB condition, cable routes, supply type and municipal requirements can change the checked quote.
- Three-phase, EV charging, commercial and larger systems require a site-specific design.